The increasing exposure to floods is a consequence of the river regulation and land reclamation works that shaped the landscape in the Tisza River floodplain.
You are here
Case studies
Furthermore, in this publication you can find a selection of adaptation case studies with some of the most representative practices.
Note: The views and documentation provided in the case studies are the sole responsibility of the author(s) of the case studies.
Other Case studies
The neighbourhood of Augustenborg, during the 1980s and 1990s an area of social and economic decline, was frequently flooded by an overflowing drainage system. Between 1998 and 2002 it was regenerated.
This case study describes the flood risk management plan and the related restoration of a formerly canalized eight kilometres stretch of the Isar river in the city of Munich (the so called “Isar Plan”).
In 2000, the governments of Bulgaria, Romania, Ukraine and Moldova pledged to work together – with the signing of the Lower Danube Green Corridor Agreement - to establish a green corridor along the entire length of the Lower Danube River (~1,000 km).
The 19th century industrialisation in Lodz heavily affected the city’s rivers, altering their ecosystems and hydrology. Many rivers in the densely built-up city were canalized. This resulted in a higher flood risk from runoff during heavy rain periods.
- « primera
- ‹ anterior
- 1
- 2
- 3
- 4